Laserfiche WebLink
/ Surveyor checks these after GIS review <br /> Math check each lot and add all parts to be sure totals are correct. <br /> I- Does the proposed CSM fit with the parcel map, if available? <br /> 1-'�Ce all structures,bodies of water,wetlands, slopes over 20%, floodplain areas, recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52 (b) <br /> oes the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues /4 <br /> rC � <br /> Reconciles with Real Property Listing—Comments <br /> Does this CSM cross the exterior boundary of a recorded plat?236.34 (1) <br /> Are additional parcels being created? #t f <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> Has there been an adjacent CSM recorded with 4 parcels of 1 '/z acres each or less within a period of 5 years? <br /> ' 236.02(12) <br /> N Is the parcel in MFL? <br /> N Does CSM change or cross school or other taxing districts? <br /> ✓Parcel Identification Number(s): .- <br /> (-'Lot Number with improvements�—Comments <br /> L 2�l t 9 l_.-JyZZ C : <br /> Treasurer Review—(Let Surveyor kno about delinquency) <br /> Treasurer Check for Taxes owed OW j <br /> SIGNATURE OF REVIEWER: DATE: <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />