Laserfiche WebLink
dg <br /> Surveyor checks these after GIS review <br /> �Math check each lot and add all parts to be sure totals are correct. <br /> v---Dogs the proposed CSM fit with the parcel map, if available? <br /> Are all structures,bodies of water,wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52 (b) <br /> Does the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> Reconciles with Real Property Listing—Comments rr <br /> Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> Has there been an adjacent CSM recorded with 4 parcels of 1 'h acres each or less within a period of 5 years? <br /> 236.02 (12) <br /> Is the parcel in MFL? <br /> RDoes CSM change or cross school or other taxing districts? <br /> t"Parcel Identification Number(s): 15 11 J <br /> V Lot Number with improvements—Comments <br /> ? � sk'4b <br /> / Treasurer Review—(Let Surveyor know out delinquency) <br /> k Treasurer Check for Taxes owed (VU <br /> U <br /> SIGNATURE OF REVIEWER: DATE: <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />