Laserfiche WebLink
SPS 383.54 Management requirements. <br /> (1) MANAGEMENT PLAN. <br /> (a)The management plan for each POWTS shall include information and procedures for maintaining the <br /> POWTS to operate and function within the standards of this chapter and as designed and approved. <br /> (b)The management plan for a POWTS shall be a part of the plan submittal under s. SPS 383.22 or 384.10. <br /> (c)The management plan for POWTS shall specify all necessary maintenance and servicing information which <br /> may include,but is not limited to all of the following: <br /> 1.Accumulated solids or byproduct removal requirements. <br /> 2. Influent quantities and qualities and effluent quantities and qualities. <br /> 3. Metering, sampling and monitoring schedules and requirements. <br /> 4. Load and rest schedules. <br /> 5. Servicing frequency requirements. <br /> 6. Installation and inspection checklists. <br /> 7. Evaluation, monitoring and maintenance schedules for mechanical POWTS components. <br /> 8. Start up and shutdown procedures. <br /> 9.Procedure for abandonment. <br /> (d)If the owner of the POWTS wishes to operate or maintain a POWTS differently than that specified in the <br /> approved management plan, a written request for approval to amend the management plan shall be <br /> submitted to the agency that initially reviewed the installation plan under s. SPS 383.22. <br /> (e)The management plan for a POWTS shall specifically address the servicing mechanics of an aerobic or <br /> anaerobic treatment tank or a holding tank where either of the following conditions exist: <br /> 1.The bottom of the tank is located more than 15 feet below the elevation where the servicing pad is located. <br /> 2.The bottom of the tank is located more than 150 feet horizontally from where the servicing pad is located. <br />