Laserfiche WebLink
s9/aR7.r� DIVISION OF INDUSTRY SERVICES <br /> lcw \ps, 2331 SAN LUIS PL <br /> � GREEN BAY WI 54304-5211 <br /> ,( `' 4 Contact Through Relay <br /> Iy http://dsps.wi.gov/programs/industry-services <br /> \V,' www.wisconsin.gov <br /> Tony Evers-Governor <br /> Dawn Crim-Secretary <br /> February 5,2020 <br /> CONDITIONAL APPROVAL <br /> PLAN APPROVAL EXPIRES:2022-02-05 <br /> Plan Review:PWTS-022000141-C <br /> KEITH E STONER <br /> 23220 Woodcreek Rd <br /> Siren WI 54872 <br /> SITE: Dufours Campground Add. <br /> Hayden Lake Rd. <br /> Town of OAKLAND <br /> Burnett County <br /> Total Amount: $400.00 <br /> FOR: <br /> In-ground Component Manual-Ver. 2.0,SBD-10705- <br /> P(N.01/01,R 10/12) <br /> Description:2250 GPD(50 Campground Sites—New Construction) <br /> Maintenance Required <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes <br /> and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. This system is to be <br /> constructed and located in accordance with the enclosed approved plans and with any component manual(s) <br /> referenced above.The owner,as defined in chapter 101.01(10),Wisconsin Statutes,is responsible for compliance <br /> with all code requirements. <br /> No person may engage in or work at plumbing in the state unless licensed to do so by the Department per s.145.06, <br /> stats. <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: <br /> • Preserve dispersal area prior and during construction to avoid disturbance,compaction and use of the site. <br /> • With new construction;it is recommended not to activate the pump in the dose tank until the tanks are <br /> pumped prior to homeowner occupancy. <br /> • Wastewater generated from contractors cleaning of equipment and tools and/or left over construction <br /> products shall not be discharged into the drains discharging to the private onsite wastewater treatment system <br /> (POWTS). Waste generated shall be properly disposed of on-site or off site. <br /> • Divert surface water from all POWTS Areas. <br /> • Prior to construction of the dispersal area,check the moisture content of the soil to a depth of 8 inches. <br /> Smearing and compacting of wet soil will result in reducing the infiltration capacity of the soil.Proper soil <br /> moisture content can be determined by rolling a soil sample between the hands.If it rolls into a 1/4-inch wire, <br /> the site is too wet to prepare.If it crumbles,site preparation can proceed. If the site is too wet to prepare,do not <br /> proceed until it dries. <br />