Laserfiche WebLink
Mound System Maintenance and Operation Specifications <br /> Service Provider's Name Ross Tollander Phone 715-566-0202 <br /> POWTS Regulator's Name Burnett county zoning Phone 715-349-2138 <br /> System Flow and Load Parameters <br /> Design Flow-Peak 450 gpd Maximum Influent Particle Size 1/8 in <br /> Estimated Flow-Average 300 gpd Maximum BOD5 220 mg/L <br /> Septic Tank Capacity 1039 gal Maximum TSS 150 mg/L <br /> Soil Absorption Component Size 450.1 ft2 Maximum FOG 30 mg/L <br /> Type of Wastewater Domestic Maximum Fecal Coliform >10E4 cfu/100 mL <br /> Service Frequency <br /> Septic and Pump Tank Inspect and/or service once every 3 years <br /> Effluent Filter Should inspect and clean at least once every 3 years <br /> Pump and Controls Test once every 3 years <br /> Alarm Should test monthly <br /> Pressure System Laterals should be flushed and pressure tested every 1.5 years <br /> Mound Inspect for ponding and seepage once every 3 years <br /> Other <br /> Miscellaneous Construction and Materials Standards <br /> 1. Observation pipes are slotted and materials conform to Table SPS 384.30-1, have a watertight cap, <br /> and are secured in as shown in the mound component manual. <br /> 2. Dispersal cell aggregate conforms to SPS 384.30 (6)(i), Wis. Adm. Code. <br /> 3. All gravity and pressure piping materials conform to the requirements in SPS 384, Wis. Adm. Code. <br /> 4. Tillage of the basal area is accomplished with a mold board or chisel plow. <br /> 5. The mound structure and other disturbed areas will be seeded and mulched to prevent soil erosion <br /> and help reduce frost penetration. <br /> Lateral Turn-up Detail <br /> Finished •............. <br /> Grade <br /> 6-8" Diameter Lawn Threaded Cleanout <br /> Sprinkler Valve Box Plug or Ball Valve <br /> Distribution <br /> _- Long Sweep 90 or Two <br /> 45 Degree Bends Same <br /> Diameter as Lateral <br /> Project: Page 5 of 7 <br />