Laserfiche WebLink
v• DIVISION OF INDUSTRY SERVICES <br /> 10541 N RANCH RD <br /> HAYWARD WI 54843-6462 <br /> S Contact Through Relay <br /> Phttp Ndsps.wi gov/programshndustry-services <br /> S WWW,wisconsm.gov <br /> Tony Evers-Governor <br /> Dawn Crim-Secretary <br /> May 5, 2020 <br /> CONDITIONAL APPROVAL <br /> PLAN APPROVAL EXPIRES: 2022-05-05 CONDITIONALLY <br /> Plan Review: PWTS-052000727-C APPROVED <br /> DEPT OF SAFETY AND PROFESSIONAL SERVICES <br /> DIVISION OF INDUSTRY SERVICES <br /> JAMES DANIELS <br /> 27760 Highway 35 <br /> Webster WI 54893 (e1,p ck. <br /> SEE CORRESPONDENCE <br /> SITE: <br /> Mallory Peterson <br /> 27345 E Connors Lake Road <br /> Burnett County <br /> Town of Oakland <br /> Gov't Lot 3—S35—T4ON—R16W <br /> FOR: <br /> Description: Mound Component Manual—Ver. 2.0, SBD- <br /> 3 Bedroom Mound—450 GPD—New 10691-P (N.01/01, R 10/12) <br /> Construction -24"to limiting factor— Pressure Distribution Component Manual—Ver. <br /> Effluent Filter- Maintenance required 2.0, SBD-10706-P (N.01/01, R. 10/12) <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin <br /> Administrative Codes and Wisconsin Statutes.The submittal has been CONDITIONALLY APPROVED.This <br /> system is to be constructed and located in accordance with the enclosed approved plans and with any <br /> component manual(s) referenced above. The owner, as defined in chapter 101.01(10),Wisconsin <br /> Statutes, is responsible for compliance with all code requirements. <br /> No person may engage in or work at plumbing in the state unless licensed to do so by the <br /> Department per s.145.06,stats. <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: <br /> Reminders <br /> • The building sewer shall be installed/insulated per SPS 382.30(11)(c) <br /> • Prior to construction of the dispersal area,check the moisture content of the soil to a depth of 8 <br /> inches. Smearing and compacting of wet soil will result in reducing the infiltration capacity of the <br /> soil. Proper soil moisture content can be determined by rolling a soil sample between the hands. <br /> If it rolls into a 1/4-inch wire,the site is too wet to prepare. If it crumbles,site preparation can <br /> proceed. If the site is too wet to prepare,do not proceed until it dries. <br /> • The mound site shall be properly prepared prior to plowing. Any grasses longer than 6"shall be <br /> cut short and removed.To avoid matting,any leaves or loose organic matter shall be raked up <br />