Laserfiche WebLink
and mobile homes that will be removed shall be properly abandoned per SPS 383.33. Maintain <br /> proper setbacks from both existing and abandoned POWTS components. <br /> • The mound length shall be oriented within 1 percent along the surface contour per SPS <br /> 383.44(6)(a)(2.). Maintain final slope of mound surface at>3:1. <br /> • Prior to construction of the dispersal area, check the moisture content of the soil to a depth of 8 <br /> inches. Smearing and compacting of wet soil will result in reducing the infiltration capacity of the <br /> soil. Proper soil moisture content can be determined by rolling a soil sample between the hands. <br /> If it rolls into a 1/4- inch wire,the site is too wet to prepare. If it crumbles,site preparation can <br /> proceed. If the site is too wet to prepare, do not proceed until it dries. <br /> • The mound site shall be properly prepared prior to plowing. Any grasses longer than 6" shall be <br /> cut short and removed.To avoid matting,any leaves or loose organic matter shall be raked up <br /> and removed.Cut trees and shrubs flush to the ground and leave stumps. Avoid operating <br /> equipment on the mound site. If necessary, use only tracked equipment,during dry conditions, <br /> with minimal passes,to avoid compaction. <br /> • A sanitary permit must be obtained from the county where this project is located in accordance <br /> with the requirements of Sec. 145.19,Wis.Stats. <br /> • Inspection of the private sewage system installation is required. Arrangements for inspection shall <br /> be made with the designated county official in accordance with the provisions of Sec. <br /> 145.20(2)(d),Wis.Stats. <br /> • A state approved effluent filter is required. Maintenance information must be given to the owner <br /> of the tank explaining that periodic cleaning of the filter is required. <br /> • A copy of the approved plans, specifications and this letter shall be on-site during construction and <br /> open to inspection by authorized representatives of the Department, which may include local <br /> inspectors. <br /> Owner Responsibilities <br /> • The current owner, and each subsequent owner,shall receive a copy of this letter. Owners shall also <br /> receive a copy of the appropriate operation and maintenance manual(s) and be responsible for <br /> ensuring that POWTS is operated and maintained in accordance with this chapter and the approved <br /> management plan under s. SPS 383.54(1). <br /> • In the event this soil absorption system or any of its component parts malfunctions so as to create a <br /> health hazard,the property owner must follow the contingency plan as described in the approved <br /> plans. <br /> • The owner is responsible for submitting a maintenance verification report acceptable to the county <br /> for maintenance tracking purposes. Reports shall be submitted at intervals appropriate for the <br /> component(s) utilized in the POWTS. <br /> In granting this approval the Division of Industry Services reserves the right to require changes or <br /> additions should conditions arise making them necessary for code compliance. As per state stats <br /> 101.12(2), nothing in this review shall relieve the designer of the responsibility for designing a safe <br /> building, structure, or component. <br /> Inquiries concerning this correspondence may be made to me at the telephone number listed below, or <br /> at the address on this letterhead. <br /> The above left addressee shall provide a copy of this letter and the POWTS management plan to the <br /> owner and any others who are responsible for the installation, operation or maintenance of the POWTS. <br />