My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/10/28 - LAND USE - LUP - Dwelling/Principle Building - Single Family - LUP-20-712
Burnett-County
>
Property Files
>
TOWN OF JACKSON
>
35599
>
2020/10/28 - LAND USE - LUP - Dwelling/Principle Building - Single Family - LUP-20-712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 11:32:44 PM
Creation date
10/28/2020 10:32:47 AM
Metadata
Fields
Template:
Property Files v2
Document Date
10/28/2020
Document Type 1
LAND USE
Document Type 2
LUP
Document Type 3
Dwelling/Principle Building - Single Family
County Permit Number
LUP-20-712
Tax ID
35599
8335
Pin Number
07-012-2-40-15-22-5 15-705-034500
07-012-2-40-15-22-5 15-705-035000
Legacy Pin
012962503500
Municipality
TOWN OF JACKSON
TOWN OF JACKSON
Owner Name
ROBERT J & SHARON L CARLSON
ROBERT J & SHARON L CARLSON
Property Address
28015 SKYLIGHT RD
28015 SKYLIGHT RD
City
WEBSTER
WEBSTER
State
WI
WI
Zip
54893
54893
Previous Owners
ROBERT J & SHARON L CARLSON
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DATA PLATE <br /> m...,,-- <br /> GENERAL INFORMATION <br /> MECHANICAL FEATURES TO BE COMPLETED IN THE FIELD <br /> Plant Name: Skyline Champion Homes AND SUBJECT TO LOCAL INSPECTION <br /> Plant Address: Hwy 61 NE Lancaster WI 53813 <br /> Corp.Address: 200 MIBCO Parkway S�ulte 290,Elkhart,IN 46514 <br /> Serial No.:_243-000-M-A 10658AB Check blank if completion is needed on site(N/A if factory installed). <br /> Std.Plan Approval No: Q110-MG 1. Interconnect ductwork between units. <br /> State Insignia No.: 510.627 2. Installation of ductwork below floor X . (basement only) <br /> Date of Manufacture:19/15/202Q <br /> 3. Interconnect gas piping below floor X . <br /> OccupancycLocation:ClBucation: R3Inc. avward.WI 4. Installation(or interconnection)of gas piping below floor X . <br /> Classification: R3 <br /> Construction Classification: Type VB 5. Extension of furnace vents above roof X <br /> Inspection Agency's Name&Address: PF$Corporation 6. Completion of gas appliance vents through roof X . <br /> 1507 Matt Pass,Cottage Grove,WI 535277. The unit must be connected to a gas supply X . <br /> Inspection Agency's Label Serial No.: 881369 and 881370 <br /> HEATING FEATURES TO BE COMPLETED IN THE FIELD AND <br /> SUBJECT TO LOCAL INSPECTION <br /> Code Certification: The exterior envelope of this home is designed for Heat Zone 1 . The <br /> 2017 National Electrical Code SPS 316 <br /> 2016 Wisconsin Uniform Dwelling Code-SPS 320-325 furnace shall have a minimum BTU output of 44,745 to maintain an <br /> 2016 Wisconsin Plumbing Code-SPS 381-387 average 70 Deg-F Interior temperature at an outside design temperature <br /> 2012 International Residential Code-Section R602.10 for wall of -25 Deg-F. It shall also have a minimum efficiency of 90 AFUE. <br /> bracing -Floor insulation Is provided if home is installed over a crawl space,but <br /> may be omitted if home Is Installed over a conditioned crawl space or a <br /> basement. Insulation for perimeter Joists and basement walls is not <br /> factory provided&is to be Installed on site <br /> ELECTRICAL SYSTEM-FACTORY INSTALLATION <br /> Concealed wiring consists of nonmetallic sheathed cable or service <br /> entrance cable. STRUCTURAL 1 MISC. <br /> Panelboard- 200 Amp. <br /> Service-120/240 V,single phase,3-wire AC,60 Hz. Design Ground Snow Load: ' 40 PSF <br /> Factory Installed appliances: Panel box should be provided with a Design Roof Dead Load: 15 PSF <br /> main over-current protection(main circuit breaker). This main service Design Floor Live Load: 40 PSF <br /> disconnecting means shall be permanently marked to identify it as a Design Floor Dead Load: 10 PSF <br /> service disconnecting means. Design Wind Load: 20 PSF <br /> Seismic Zone: N/A <br /> This home has been designed for(frame-off X or frame-on_) <br /> installation over a(crawl space or basement x ). <br /> APPLIANCE MANUFACTURER MODEL MN <br /> Cooking Range Whirlpool WEE750HOH21 15 amp <br /> Refrigerator Whirlpool WRF555SDFZ11 20 amp <br /> Clothes Washer Whirlpool WTW4855HW1 20 amp THERMAL RATING OF STRUCTURE <br /> Clothes Dryer Whirlpool WED4850HWO 30 amp ���g <br /> Dishwasher Whirlpool WDF520PADB 15 amp 'R Value for Main WallLs' -R-50- <br /> 'R'Va ue orMain Roo Gelling: <br /> Food Waste Whirlpool WG02H 15 amp 'R'Value for Floor: N/A <br /> Fireplace Superior MHD35DMN 15 amp <br /> Microwave Whirlpool WMH30516H20 20 amp <br /> Smoke Detector FirstAlert SC91208 15 amp Vapor Retardant Paint per Manufacturer's Instructions: <br /> Specialty Adhesives,Inc. <br /> #7800 Vapor Barrier Paint - 4 Mil.Minimum Thickness <br /> ELECTRICAL FEATURES TO BE COMPLETED IN THE FIELD STRUCTURAL FEATURES TO BE COMPLETED IN THE FIELD <br /> AND SUBJECT TO LOCAL INSPECTION <br /> AND SUBJECT TO LOCAL INSPECTION <br /> 1. Construction of foundation(including columns,piers and footings). <br /> Check blank if completion Is needed on site(N/A if factory installed). 2. Module-to-module connection and foundation construction. <br /> 1. Interconnect electrical between units. 3. Completion of exterior closure systems(underlayment,shingles, <br /> 2. Installation of service and completion of grounding electrode wall sheathing&siding). <br /> system. (Service entrance conductor to be rated 75 deg.C.) 4. Switch,light and hand rail for attic storage/cape cod home. <br /> 3. Bonding of gas Ilne piping. 5. Finishing of upper level for cape cod home(optional). <br /> 4. Completion of basement panel box. X . 6. Completion of cape cod dormer installation(optional). <br /> 5. Installation of water heater&/or furace in basement X . <br /> 6. Receptacles provided for crawl space or basement are to be TESTS REQUIRED AND ACTUALLY CONDUCTED <br /> GFCI protected(per Sec.210-8(a),(4)&(5)of NEC). FACTORY TESTS CHECK,IF CONDUCTED <br /> 1. Water Distribution: X <br /> PLUMBING FEATURES TO BE COMPLETED 1N THE FIELD 2. Drainage,Waste&Vents: X <br /> AND SUBJECT TO LOCAL INSPECTION 3. Fixtures: X <br /> Check blank if completion is needed on site(N/A if factory installed). 4. Shower Compartment: ____X-._ <br /> 5. Gas piping prior to appliance connections: N/A <br /> 1. Interconnect plumbing between units. <br /> 2. Extension of plumbing vents above roof X . 6. Gas piping t enr th applianceet: connections: NX <br /> 3. Installation of water lines below floor X X .(basement only) 7. Dielectric Strength Test: X <br /> 4. Installation of drain lines below floor X . 9. PolarityBondn Con X <br /> 5. Completion of radon gas control system N/A. 9. Operational Test: <br /> X <br /> 6. The unit must be connected to a public water supply and 10. Test: X <br /> if these are available. 11.n Panelboard Lug Tightness: _ 6_ <br /> system,sewer <br /> All final testing to be conducted on site in accordance with the installation manual <br /> 7. All necessary fire-stopping caused by plumbing penetrations& (or local jurisdiction)8 subject to local inspection. <br /> not done at the plant to be finished on site. <br /> 8. A backwater valve must be installed in the building drain system. <br /> '•ALL INSTALLATION TO BE IN ACCORDANCE WITH <br /> MANUFACTURER'S INSTALLATION INSTRUCTIONS.** <br />
The URL can be used to link to this page
Your browser does not support the video tag.