We will be replacing two old wooden bridges that were placed on the land back in the late <br /> 1950s,we believe. The first bridge is currently over a 13 foot wide river that is two feet above the <br /> water. The water level is 11 inches. The second bridge is currently over a 13 foot wide river that is two <br /> feet above the water. The water level is 8 inches. Both bridges will span the North fork of the Wood <br /> River. frhe old wooden structures will be removed and replaced with new bridges that are constructed <br /> of steel and wood. When the new bridges are placed no trees will be removed and we will not be <br /> changing any landscaping. Both new bridges will be sitting on top of the ground. <br /> The new bridges will both be constructed of exactly the same materials. The material are: <br /> 2-14"x 22#I-BEAM 20',9.5-4"C-CHANNEL 20',2-8"x 3/8"FLAT 20',2-2"SCHEDULE 40 PIPE 20', <br /> 4-2"SCHEDULE 40 PIPE ELBOWS,4-1/2"WELD ON D-RINGS,and 15-2"x 8"TREATED 20'. Both bridges <br /> will be two I-beams 14"tall and about 80"apart from center to center and 4"c-channels 108"wide. <br /> Every 16"and 3/8"x 8"plates will be welded on the outside of the c-channels. <br />