Laserfiche WebLink
tAI IIf a private road is proposed make sure"Road"isn't used in the name.Use Lane,Drive,Path,Trail, <br /> Way,Circle,etc. to signify a private road. <br /> N'1 If a private road is proposed,has the private road sign fee been paid? <br /> Surveyor checks these after GIS review <br /> Math check each lot and add all parts to be sure totals are correct. <br /> _ <br /> owes the proposed CSM fit with the parcel map,if available? <br /> t,-16e all structures,bodies of water,wetlands, slopes over 20%, floodplain areas,recorded easements <br /> and, �enants on the site and adjoiners shown?BC Ord. 58-52 (b) <br /> y Does the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data <br /> is shown. <br /> RPL Review—Surveyor looks into any issues r <br /> V Reconciles with Real Property Listing—Comments <br /> Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> N/iHas there been an adjacent CSM recorded with 4 parcels of 1 '/2 acres each or less within a period of <br /> 5 years? 236.02(12) <br /> I " Is the parcel in MFL? <br /> NDoes CSM change or cross school or other taxing districts? <br /> Parcel Identification Number is <br /> /Lot Number with improvements—Comments &f <br /> Treasurer Review—(fit Surveyor know about delinquency) <br /> /Treasurer Check for Taxes o ed O /i( (64._ <br /> 7 / <br /> SIGNATURE OF REVIEWER: DATE: 9 / <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet 12-22-2014 �� <br />