Laserfiche WebLink
I <br /> 9 <br /> 1 <br /> d <br /> i <br /> 1 <br /> f <br /> FINDINGS OF FACT <br /> 1. Tim Danelius has filed an application for a permit to install riprap on the banks of <br /> Yellow River, located in the Town of Meenon, Burnett County, also described as being <br /> in the SWI/4 of the SW1/4 Section 12, Town 39 North, Range 16 West. <br /> 2. The Department has completed an investigation of the project site and has evaluated <br /> the project as described in the application and plans. <br /> i <br /> 3. Yellow River is a navigable water(and no bulkhead exists at the project site.) <br /> E <br /> 4. The proposed project, if constructed in accordance with this permit will not adversely <br /> affect water quality, will not increase water pollution in surface waters and will not <br /> cause environmental pollution as defined in s. 283.01(6m), Wis. Stats. <br /> 5. The proposed project will not impact wetlands if constructed in accordance with this <br /> permit. <br /> 6. The Department of Natural Resources has determined that the agency's review of the <br /> proposed project constitutes an equivalent analysis action under s. NR 150.20(2), I <br /> Wis. Adm. Code. The Department has considered the impacts on the human <br /> environment, alternatives to the proposed projects and has provided opportunities for <br /> public disclosure and comment. The Department has completed all procedural <br /> requirements of s. 1.11(2)(c), Wis. Stats., and NR 150, Wis. Adm. Code for this <br /> project. <br /> 7. The Department of Natural Resources has completed all procedural requirements and <br /> the project as permitted will comply with all applicable requirements of sections <br /> 30.12(3m), Wisconsin Statutes and Chapters NR 102, 103, of the Wisconsin <br /> Administrative Code. <br /> 8. The structure or deposit will not materially obstruct navigation because the rock will be <br /> placed up on the existing bank. <br /> 9. The structure or deposit will not be detrimental to the public interest because fish and <br /> wildlife will still have access to the shoreline after placement or riprap, and help <br /> prevent soil erosion. <br /> i <br /> 10.The structure or deposit will not materially reduce the flood flow capacity of a stream <br /> because the rock will be placed on the shores of Big Trade Lake. <br /> The applicant was responsible for fulfilling the procedural requirements for publication of <br /> notices under s. 30.208(5)(c)l m., Stats., and was responsible for publication of the notice of <br /> pending application under s.30.208(3)(a), Stats. or the notice of public informational <br /> hearing under s.30.208(3)(c), Stats., or both. S. 30.208(3)(e), Stats., provides that if <br /> no public hearing is held, the Department must issue its decision within 30 days of the <br /> 30-day public comment period, and if a public hearing is held, the Department must <br />