Laserfiche WebLink
Page of <br /> MANAGEMENT PLAN <br /> This Private Onsite Wastewater Treatment System(POWTS)has been designed,and is to be installed and <br /> maintained in according to Comm 83 WI Admin Code,the In-Ground Soil Absorption Component Manual <br /> for Private Onsite Wastewater Treatment Systems(SBD-10567-P;June 11, 1999),and the Washburn <br /> County Private Sewage System Ordinance. <br /> 1. TF-,POWTS has been designed to accommodate a maximum daily flow of <br /> ___ _gallons of domestic wastewater per day. <br /> The quality of influent discharged into the POWTS treatment of dispersal component <br /> shall be equal to or less than all of the folkwring: <br /> a monthly average of 30 mg/L fats,oil and grease. <br /> a monthly average of 220 mg/L BODS. <br /> a monthly average of 150 mg/L TSS. <br /> Wastewater shall not be discharged to the POWTS in quantities or qualities that <br /> exceed these limits or that result in exceeding the enforcement standards and <br /> preventative action limits specified in ch.NR 140 Tables 1 &2 at a point of <br /> standards application,except as provided in Comm 83.03(4),WI Admin.Code. <br /> 2. The owner of this POWTS is responsible for system operation and maintenance. <br /> The following maintenance shall occur within three(3)years of the date of <br /> installation and at least once every three years thereafter: <br /> 1. The septic tank shall be pumped by a certified septage servicing operator, <br /> licensed under s.281.48,WI Stats,unless inspection by a licensed master <br /> plumber or other person authorized to make such inspection,finds less <br /> than one-third(1/3)of the tank volume occupied by sludge and scum. <br /> More fiequent pumping may be necessary to prevent solids from exceeding <br /> one-third(1/3)of the volume of the tank. <br /> Wastes shall be disposed of by the pumper in accordance with ch.NR 113, <br /> WI Admin.Code. <br /> At each pumping the pumper must visually inspect the condition of the tank, <br /> battles,risers,and manhole cover and verify that any required locks are <br /> present. <br /> 2. The soil absorption component(s)shall be visually inspected by a licensed <br /> master plumber,certified septage servicing operator or POWTS inspector, <br /> inspection shall check for evidence of discharge of sewage to the ground <br /> surface and for ponding of effluent in the distribution cell. <br /> 3. The tank filter(s)shall be inspected and cleaned to remove any accumulated <br /> solids according to manufacturer's specifications The filter cartridge shall <br /> not be removed unless provisions are made to retain solids in the tank. <br /> Cleaning of the filter at more frequent intervals may be necessary. <br />