Laserfiche WebLink
RICHARD HOPKINS Page 2 4/17/2015 <br /> • Maintain well and waterline set backs per SPS 383.43(8)(i). <br /> • Insulate building sewer per SPS 382.30(1 1)(c). <br /> A copy of the approved plans, specifications and this letter shall be on-site during construction and open to <br /> inspection by authorized representatives of the Department,which may include local inspectors. All permits <br /> required by the state or the local municipality shall be obtained prior to commencement of <br /> construction/installation/operation. <br /> In granting this approval the Division of Industry Services reserves the right to require changes or additions should <br /> conditions arise making them necessary for code compliance.As per state stats 101.12(2),nothing in this review <br /> shall relieve the designer of the responsibility for designing a safe building,structure,or component. <br /> Inquiries concerning this correspondence may be made to me at the telephone number listed below,or at the address <br /> on this letterhead. <br /> The above left addressee shall provide a copy of this letter and the POWTS management plan to the owner and any <br /> others who are responsible for the installation,operation or maintenance of the POWTS. <br /> Sincerely, Fee Required$ 250.00 <br /> Fee Received$ 250.00 <br /> Balance Due $ 0.00 <br /> Patricia L Shandorf <br /> POWTS Plan Reviewer,Division of Industry Services WiSMART code:7633 <br /> (715)634-7810, Fax: (715)634-5150,M-F 8:00 a.m. -4:45 p.m. <br /> pat.shandorf@wisconsin.gov <br /> cc: Edwin A Taylor, Wastewater Specialist,(715)634-3484,Monday-Friday 8:00 am To 4:30 pm <br />