Laserfiche WebLink
3/17/2011 <br /> PRELIMINARY COST SUMMARY <br /> 27913 SAND LAKE RD- 14X28 CABIN ADDITION W/ LOFT OVER EXIST. <br /> WEBSTER, WI <br /> % OF <br /> DIVISION SCOPE OF WORK COST TOTAL <br /> Division 2 Excavation (L& M) $1,236 5.0% <br /> Division 3 Concrete (L& M) $2,226 9.1% <br /> Division 4 Masonry (L & M) $2,016 8.2% <br /> Division 6 Lumber(M) $3,919 16.0% <br /> Division 6 Rough Carpentry (L) $3,650 14.9% <br /> Division 7 Insulation (L& M) $550 2.2% <br /> Division 7 Siding (L& M) $1,904 7.8% <br /> Division 7 Roofing (L & M) $1,197 4.9% <br /> Division 8 Doors &Windows (M) $3,400 13.9% <br /> Division 9 Drywall (L& M) $1,687 6.9% <br /> Division 15 Plumbing/HVAC (L& M) $1,000 4.1% <br /> Division 16 Electrical (L& M) $1,700 6.9% <br /> TOTAL $24,484 100.0% <br /> 1 of 1 Printed On: 4/6/2011 <br />