Laserfiche WebLink
• Thanks, <br /> Dan <br /> 906-630-7514 <br /> On Thu, Aug 13, 2020 at 9:15 AM Towne, Jason<jtowne@burnettcounty.org>wrote: <br /> Hi Daniel, <br /> See my responses below in yellow. Let me know if you have any questions. <br /> Thanks, <br /> Jason <br /> From: Daniel Panik<daniel.panik@gmail.com> <br /> Sent:Wednesday, August 12, 2020 12:39 PM <br /> To:Towne,Jason<itowne@burnettcounty.org> <br /> Subject: Hischer Lake Lot <br /> Jason, <br /> I spoke with you a year ago along with Dan Hischer at their lake lot on Big Mckenzie. We are doing a 20% <br /> lateral expansion and for the mitigation would like to do stormwater treatment underground. Mike Kornmann <br /> suggested using infiltration tunnels that are typically used for drainfields. The one thing Mike did not have an <br /> answer to is the set back requirements for stormwater treatment. How far to do the tunnels need to be away <br /> from the lot line, cabin, private road? I would treat them the same as setbacks required for a sanitary system, <br /> since that is basically the same function. <br /> Another question I have is we would like to add outside access to the crawl space through Bilco doors. Am I <br /> correct in thinking the square footage of the bilco door does not add to cabin cabin main floor square footage <br /> for the 20% lateral expansion limit? We can ignore them if they are only used for people to access the <br /> basement. We are ready to finalize the cabin drawings so we can get a building permit. Dennis Quinn <br /> recommended I contact you about this. <br /> Thanks, <br /> 2 <br />