My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/11/30 - OTHER - (NA) - Correspondence
Burnett-County
>
Property Files
>
MULTI PARCEL DOCS
>
Correspondence
>
2023/11/30 - OTHER - (NA) - Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 9:16:02 AM
Creation date
12/1/2023 9:13:08 AM
Metadata
Fields
Template:
Property Files v2
Document Date
11/30/2023
Document Type 1
OTHER
Document Type 2
(NA)
Document Type 3
Correspondence
Tax ID
34004
34005
Pin Number
07-042-2-38-18-26-2 02-000-011001
07-042-2-38-18-26-2 02-000-012001
Municipality
TOWN OF WOOD RIVER
TOWN OF WOOD RIVER
Owner Name
JARED P & JENNIFER C FABER
SCOTT & STEPHANIE GABERT
Property Address
11345 CROSSTOWN RD
23145 TOWN RD A
City
GRANTSBURG
GRANTSBURG
State
WI
WI
Zip
54840
54840
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> To abandon and remove the dam an application will need to be submitted that includes the following items.The link for <br /> the application can be found on this webpage: https://dnr.wisconsin.gov/topic/dams/DamRemovalAbandonment.html <br /> 1. Application form <br /> 2. Application fee (with after-the-fact fee addition) <br /> 3. Ownership documentation <br /> 4. Plans and specs <br /> • Existing and proposed profile of stream in 25-ft increments 250-ft up and downstream.This should <br /> include a labeled point where the sheet pile is and what it will be removed to. <br /> • Existing and proposed cross sections two upstream and two downstream with one cross section at the <br /> sheet pile location.The most upstream and downstream cross sections should be located where work <br /> will begin and end.The other two cross sections should be between the sheet pile and the most <br /> upstream and downstream cross section. <br /> • Slopes should be in a stable configuration (no steeper than 2:1—horizontal:vertical). Outline material <br /> proposed to stabilize the channel and side slopes. <br /> 5. Narrative description: <br /> • What the project is, purpose of project, and need for the project. <br /> • Information on other participants if this is a cooperative effort. <br /> • The parts of the dam that will be removed to render it abandoned. <br /> • How you intend to carry out the project, including methods of dam removal, materials, and equipment. <br /> • Your proposed construction schedule and sequence of work. <br /> • The location of any disposal area for the dam materials. <br /> • The stream channel and flowage bed restoration including protection needs. <br /> 6. Riparian owners list- List the names and addresses of the adjacent property owners. <br /> 7. Erosion control standards <br /> After the application is submitted, I will forward the materials to our resource managers (fisheries, wildlife, streams <br /> biologist, etc.)to see if they have any comments or concerns. <br /> When this work is approved and complete, DNR reserves the right to inspect the work location for one year and require <br /> additional work if necessary. <br /> These items are also outlined in the attached abandonment/removal checklist: <br /> http://dnr.wi.gov/topic/Dams/documents/DamAbandonmentRemoval.pdf <br /> Thank you for your cooperation, <br /> We are committed to service excellence. <br /> Visit our survey at http://dnr.wi.gov/customersurvey to evaluate how I did. <br /> Jacob Druffner <br /> Water Management Engineer I Waterways Bureau/External Services Division <br /> Wisconsin Department of Natural Resources I Spooner,WI 54801 <br /> Phone:(715)461-0159 <br /> jacob.druffner@wisconsin.gov <br /> Aka <br /> dnr.wi.gov <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.