My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/09/20 - LAND USE - LUP - Accessory Structure (Non-Bunkhouse) - LUP-24-632
Burnett-County
>
Property Files
>
TOWN OF OAKLAND
>
33457
>
2024/09/20 - LAND USE - LUP - Accessory Structure (Non-Bunkhouse) - LUP-24-632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 12:50:31 PM
Creation date
9/20/2024 12:36:38 PM
Metadata
Fields
Template:
Property Files v2
Document Date
9/20/2024
Document Type 1
LAND USE
Document Type 2
LUP
Document Type 3
Accessory Structure (Non-Bunkhouse)
County Permit Number
LUP-24-632
Tax ID
33457
Pin Number
07-020-2-40-16-33-5 05-004-013100
Municipality
TOWN OF OAKLAND
Owner Name
DOUGLAS L THOMPSON ONA E ESCH
Property Address
7150 S DEVILS LAKE DR
City
WEBSTER
State
WI
Zip
54893
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Burnett County Mitigation Options <br /> A poctore and maintain native veaetatinn along the vegetative buffer zone within 35 feet of the ordinary <br /> high water mark with a state allowed width viewing and access corridor on lots with 200.00 feet or more <br /> of<1 r(linr (7 l rniT.te) <br /> B. Restore and maintain native vegetation along the vegetative buffer zone within 35 feet of the ordinary <br /> high water mark with only a 30 foot wide viewing and access corridor on lots with 200.00 feet or more <br /> of shoreline. (4.0 points) <br /> C. Restore and maintain native vegetation along the vegetative buffer zone within 35 feet of the ordinary <br /> high water mark with a state allowed width viewing and access corridor on lots with less than 200 feet <br /> of shoreline, hurt more than 100 feet of shoreline. (2.0 r pints) <br /> D. Restore and maintain native vegetation along the vegetative buffer zone within 35 feet of the ordinary <br /> high water mark with only a 20 foot wide viewing and access corridor on lots with less than 200 feet of <br /> shoreline hot more than 100 feet of shoreline. (3.0 points) <br /> E. Restore and maintain native vegetation along the vegetative buffer zone within 35 feet of the ordinary <br /> high water mark with a state allowed width viewing and access corridor on lots with less than 100 feet <br /> of shoreline. (1.0 points) Allow 35% of shoreline to be used for the viewing and access corridor for lots <br /> with 100 feet or less of shoreline. <br /> F. Restore and maintain native vegetation along the vegetative buffer zone within 35 feet of the ordinary <br /> high water mark with only a 15 foot wide viewing and access corridor on lots with less than 100 feet of <br /> shoreline. (7.0 points) <br /> G. Restore and maintain the vegetation protection area. (2.0 points) The use of this option requires the <br /> vegetative buffer zone and viewing and access corridor to be in compliance or be brought into <br /> compliance <br /> H. Remove nonconforming accessory buildings from the shoreland setback area. (1.0 points for a structure <br /> from 0.01 square feet to 199.99 square feet in size, 2.0 points for a structure 200.00 square feet or <br /> larger). Illegal structures do not qualify for these points. Exempt structures (boathouse, stair/walkway. <br /> etc)do not qualify for these points. <br /> T. Installation of glitters on all structures on the lot/parcei and divert ail gutter water to a rain garden <br /> located on the same lot/parcel or storm water treatment device located on the same lot/parcel (3.0 <br /> points). Rain garden or storm water treatment device must be designed by a Wisconsin licensed <br /> professional engineer and the engineer must sign off after construction that it was built according to the <br /> plans. Maintenance on the rain garden or storm water treatment device must be performed as required. <br /> Rain garden or storm treatment device must be able to handle and treat a 10 yr storm event. This type of <br /> mitigation in section 17(6)(I)can he excluded from the impervious surface calculation in section 13.2. <br /> J. Divert all water from gutters, driveways, patios, sidewalks and all other impervious surfaces on the <br /> lot/parcel to a rain garden located on the same lot/parcel or storm water treatment device located on the <br /> same lot/parcel (4.0 points). Rain garden or storm water treatment device must be designed by a <br /> Wisconsin licensed professional engineer and the engineer must sign off after construction that it was <br /> built according to the plans. Maintenance on the rain garden or storm water treatment device must be <br /> performed as required. Rain garden or storm treatment device must be able to handle and treat a 10 yr <br /> storm event. This type of mitigation in section 17(6XJ) can be excluded from the impervious surface <br /> r•Ilr•nlatir.n 1n cer`tir►n 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.