Laserfiche WebLink
i <br /> Soil Absorotion Natem Cross Section <br /> f..� 100.0 ft <br /> 4'Schedule 40 Final Grade <br /> PVC Vent Pipe 98.0 ft <br /> Wkh Vent Cep <br /> Leaching .♦ <br /> Chamber ♦_ 97.0 ft <br /> System Elevation <br /> 3 ft 3 ft <br /> Soil Absolwtion System Plan Vlew <br /> ft <br /> ft <br /> I <br /> _ft Leaching Trench 1 <br /> Vent Or Observation Pipe Chambers R <br /> 4'Dia. <br /> Trench 2 Header <br /> Leaching Chsmber Sosciflcatlons <br /> Manufacturer And Model infiltrator Quick 4 <br /> EISA Rating 20 sq ft per chamber Soil Application Rate 7 gpd/sq ft <br /> 300 gpd Design Flow+ .7 Soil Application Rate + 20 EISA= 22 Chambers <br /> 2 rows of 1 chambers each. <br /> j Page 2 of 6 <br />