Laserfiche WebLink
Report on Whitetails Campground <br />Permit History: <br />June 3,d, 1975: David Olson was granted a CUP (213) for 175 campsites on this land, but he never <br />established the campsites. <br />April 5th, 1994: Michael Waltzing was granted a CUP (1007) for 50 camp sites; they were required to <br />acquire sanitary permits and state licensing. The bar was not established at this time but was <br />referenced in the application. <br />June 9th, 1994: Sanitary permit (17785) issued for the bar. System sized for 962 Gallons per day <br />conventional system. System installed June 14th, 1994. It had a grease interceptor. Sized for: <br />58 bar stools @ 9 gal/day each (paper service) = 522 gal <br />2 employees @ 20 gal/day each = 40 gal <br />2 floor drains @ 50 gal/day each = 100 gal <br />20 showers @ 15 gal/day each = 300 gal <br />Total = 962 gal/day <br />May 31St, 1995: Sanitary permit (18581) issued for the dump station behind the sign by highway 35. It <br />was sized at 500 gallons per da to serve the 50 campers. It appears it was installed almost two years <br />later on April 17th, 1997. There was a note in the app kation that stated if no shower and toilet facilities <br />were present the sites were to be sized at "50" gallons per day/campsite. <br />September 7th, 1995: Waltzing was issued a LUP (18962) for a walk-in cooler/storage area (12x22) to go <br />out the north side of the bar by the grease interceptor. It was conditioned that it remains at least 5 feet <br />from the septic tanks. <br />August 6th, 1999: Waltzing was issued a LUP (22990) for a pole building on the golf course lot next to his <br />home. This structure was permitted at 30x45. <br />July 31St, 2000: Waltzing was issued a LUP (24242) for another pole building sized 30x54. This building <br />was constructed towards the back of the campground. <br />November 18th, 2002: Waltzing was issued sanitary permit (27094) as a revision to the bar sewer. They <br />proposed an addition to the bar that would go over the existing septic tank. The revision was to move <br />this septic tank away from being under the building. No inspection sheet is found. <br />February 20, 2003: Waltzing received LUP (27314) to expand the bar by 2436 on the North side and <br />8x30 on the East side respectively. They petitioned to the state for a variance to build the addition at <br />one foot from the existing drain field. This variance was granted and construction commenced. They <br />stated in a letter that no seating amounts would change per this addition just free up space. Conditions <br />for the approval included the drainfield to be fenced off, seating capacity shall not change and rain <br />