Laserfiche WebLink
Email to the Blazeks on 2/3/2016 SB <br />As discussed, February 26', 2016 is the last extension that we can give to get these permits in order. If you <br />can get all of the following permits in order by then, we will accept double fees, and we will not need to <br />issue any citations: <br />1. Dwelling permit totaling 600 dollars <br />2. Stair permit totallying 250 dollars <br />3. Sanitary permit pulled by a master plumber; see attached list <br />As for the flush privy, we will condition on your dwelling permit that all the plumbing fixtures such as <br />toilets, sinks, or showers be removed from the structure to keep it as a shed. Also, you had mentioned the <br />shed by the lake had been moved. This needs to stay in a conforming location and we will verify this. <br />Please fill out the attached land use application for stairs, and single family dwelling. Include a plot plan <br />showing the location of the buildings. Include a floor plan of the house in a complete state. I cannot issue <br />the dwelling permit until a sanitary permit has been obtained. This does not mean the system needs to be in <br />the ground. It is paperwork done by a master plumber that I believe can be done in this timeframe. <br />Again, thank you for getting a hold of us to work this out. We try to be as helpful as possible through these <br />ordeals, but people need to be willing and able to work with us. <br />Shane Buchholz <br />All permits obtained 3/1/2016 SB <br />