Laserfiche WebLink
Waterway BMPs <br /> The municipality is responsible for ensuring the project meets BMP standards before, during and <br /> after construction. A copy of water quality BMPs is attached to this letter. <br /> This reach of Trade River is a warm water stream. Therefore, bridge removal work should not take <br /> place between March 1 and June 15, both dates inclusive. This construction BMP minimizes <br /> impacts to fish and other aquatic organisms during sensitive time periods such as spawning, winter <br /> dormancy, and migration. <br /> The bridge and abutments must be removed in large pieces and minimal amounts of concrete <br /> debris may be left in the streambed. Concrete debris and other materials from the bridge removal <br /> must be disposed of in approved upland location. <br /> Waterway Recommendations <br /> This project is in a mapped flood plain area. The County Zoning office should be contacted with <br /> any questions about local zoning ordinances or NR116 requirements. <br /> Inspections <br /> The Department conducts routine inspections and may follow up to inspect your project to verify <br /> compliance with state statutes and codes. If you decide to modify your project, please contact your <br /> local Department Transportation Liaison to discuss any proposed modifications. <br /> Federal & Local Permitting <br /> The municipality is responsible for obtaining any local, state or federal permits that may be required <br /> before starting your project. <br /> If you have any questions regarding the contents of this letter, please call me at (715) 635-4229 or <br /> email amy.cronk@wisconsin.gov. <br /> Sincerely, <br /> AYWI <br /> Amy Cronk <br /> WDNR Transportation Liaison <br /> cc: Jason Towne, Burnett County Zoning Administrator <br /> Jason DiPiazza, MSA <br /> Rhonda Kenyon, DNR <br />