Laserfiche WebLink
Page 3 of 7 <br /> Cross Section of an Inground Component Cell <br /> Using Leaching Chambers <br /> 43Leaching chambers ( Approx. 215' in length) <br /> Proposed chambers centered over the approx. 93.25' contour. <br /> / Observation/Vent Pipes <br /> Finished Grade = 94.00' <br /> Slope % = 6.5-10% <br /> Original Grade = 93.25' ;Y <br /> }, t ,f <br /> Top of Shell = 91.25' V <br /> m 1 <br /> System Elev. = 90.25'' <br /> Treatment and Dispersal Zone <br /> _- Limiting Factor <br /> Observation/Vent pipes to be constructed and capped with approved materials for the <br /> particular use. <br /> Locate observation pipes at opposite ends of the distribution cell, and 1/5 to 1/10 the <br /> length of the distribution cell measured from the end of the cell. <br /> Sizing Calculation= 750 gal. DWF / .7 soil loading rate = <br /> 1071.43/ an EISA Rating of 25 for the ARC 36 Bio-diffuser= <br /> 42.86 or 43 chambers. <br /> v� <br />